CRE PROTOCOLSUB-TIER LIEN GAP: $270,000.00Deficit Ratio: 60% (1 Trade Flagged)

METROPOLITAN-TOWER-B-DRAW-12

• Metropolitan Tower B — Core & Shell • Contractor: Apex Commercial Contractors JV • Ref: Master Accord
Download Dossier (PDF)

Schedule of Values Audit • G703 Invariant Engine

Circuit Breaker
1/1 Lines Reconciled
LineTrade / DescriptionScheduledClaimedHaircutStatus
01
CIP Concrete Shear Walls
Exhibit C § 9.3 • Retainage Step-Down Covenant
$3,400,000.00$82,000.00-$82,000.00BREACH
INSPECTED LINE 01 • 03-200

CIP Concrete Shear Walls

HAIRCUT APPLIED
Compiled Contract Invariant (AST Node)Zero Generative Hallucination
1. Legal Covenant Source • Exhibit C § 9.3

“Retainage shall step down to 5.0% upon crossing 50.0% completion.”

2. Executable Logic Node • ConditionalExpression (AST-PyKernel-v4)
LHS: Project.CumulativeCertifiedProgress (0.542)
Operator: >=
RHS: Covenant.Threshold (0.500)
→ Action: SET_ALLOWABLE_RETAINAGE(WorkCompleted * 0.05)
3. Deterministic Evaluation (Zero Tolerance)Variance Tripped
Certified Facts:54.2% Physical Completion [TRIGGERED]
Allowable by Covenant:$0.00
Contractor Requisitioned:$82,000.00
Deterministic Variance:-$82,000.00
Statutory Citation:New York (GBL § 756-a)
Treasury Allocation:Vault B (Disputed Escrow Hold)
FRE 902(14) Merkle Seal:sha256:83d098e94a12fbc7c...